Alhambra High School
- C& D Building Roofing Restoration
- Hybrid Vinyl Tile/Hybrid Resilient Carpet Installed
- Conference Room Repainted
- Tectum Ceiling Panels
|
Baldwin
-
- Hybrid Vinyl Tile (HVT) Installed
- Auditorium Roof Repair
- New Auditorium Seating
|
Brightwood
- Abatement
- Hybrid Vinyl Tile (HVT) Installed
- E-building Restroom Rehabilitation
- E-building Roof Restoration
- Privacy Fence Screen
|
Century High School
-
- Asphalt Repair
- Repainted Stairwells and Classroom Doors
|
Emery Park
- Asphalt Repair
- D-building Roof Restoration
|
Fremont
-
- New Irrigation System Installed
- New Plant Materials
- New Inlet Gate (Staff Parking)
|
Garfield
- Kitchen and Cafeteria Repainted
- Hybrid Vinyl Tile (HVT) Installed
|
Granada
-
- Hybrid Vinyl Tile (HVT) Installed
|
Marguerita
- Playfield Renovation
- Epoxy Kitchen Floor Installed
- Hybrid Vinyl Tile (HVT) Installed
- Time Capsule (To be opened Jan. 2074)
|
Monterey Highlands
-
- Removal and Replacement of D-building Railings
- F-building Roof Restoration
|
Mark Keppel High School
- Playfields Renovation
- Repainted Kitchen 2D Mural (Before & After)
- New Flooring (Kitchen/Cafeteria)
- Hybrid Vinyl Tile Installed (HVT)
- Remodel of Cafeteria, Kitchen, and Serving Line
- New Furnished Library
|
Northrup
-
- Restroom Rehabilitation
- Privacy Fence Screen
- A-building Roof Restoration
- Auditorium Rehabilitation
|
Ramona
- Hybrid Vinyl Tile Installed (HVT)
- Restroom Rehabilitation
- D-building Roof Restoration
|
San Gabriel High School
-
- Sewer Line Replacement
- Arena Floor Entry Replacement
- Abatement
- New Irrigation System
- Playfield Renovation
- Remodification of Career Center
- Roof Restoration (L, M, & U-building)
- Hybrid Vinyl Tile (HVT) Installed
- New Paint (Arena, Cafeteria, and Various Classrooms)
- Career Center Remodel
- Turf Installation (Bus Drop Off Zone)
- Restore Gym Floors (Arena, Large Gym, and Small Gym)
|
Repetto
- Hybrid Vinyl Tile (HVT)
- Six Classrooms Repainted
|
|
|
|
|
|